Tuesday, March 24, 2015

Gained in the field of energy efficiency in business in the three-day training, ovens, lighting, mo


3 group training for staff as part of the project KOSGEB September, November and was completed in Ankara and Istanbul in December 2013 months. A total of 55 people participated in the study were followed in the business gezilerek potential energy cardell cabinets efficiency measures in place.
Gained in the field of energy efficiency in business in the three-day training, ovens, lighting, motors, are described with examples of French and Turkish experts as technical information about alanlarıil compressed air. Ankara during training 'in Synchronous cardell cabinets Machine Plastic and PAL, Sardoğan machine in Istanbul, Nazar Chemistry and Duravit ceramic enterprises trainees and trainers were made with some determination, together with the trainees were visited. These findings were compiled cardell cabinets into smaller reports. Some parts of these reports in terms of more than one hour to give an idea about the nature of the determination based on the observations are given below without specifying the name of the facility; LIGHTING Production has made a homogeneous illumination in the field and LED lighting are used in some corridors. cardell cabinets separate-separate control of each corridor cardell cabinets can be made for LED lighting. However, the presence of mold, also be utilized in some special fittings products come out that point. In addition, at various points, especially in the daytime in light tubes near the door can be achieved using the closure of lighting. Most of the lighting in operation cardell cabinets consists of 400 watt metal halide lamp fixtures health. Fixtures placed at least 12 m in height, very dirty and almost all of the lights in the upper, lighting efficiency and greatly discredited very old lamps. Although all good natural lighting Business lamps left open during daylight hours (determined our visit). Where reference is made production lüksmetreyl enlightenment proper place to measuring the absolute intensity of the electronic ballast, reflector luminaires must be installed in series equipped with efficient TL5 lamps.
PRODUCTION PROCESS power consumption cardell cabinets measurements are performed in each production hall. A wattmeter cardell cabinets can be installed to measure the energy consumption of each injection machine. Thus, in each machine, energy consumption per product produced (Specific Energy Consumption) and therefore can be removed detailed product costs. This procedure can also be purchased cardell cabinets with an energy analyzer. Energy Analyzer in order to connect the machine cardell cabinets is possible to measure energy consumption cardell cabinets during production. Despite losses in the current transformer transformer factory is not seen energy and leakage should be investigated. Given that a good transformer on load between 1-3% of the losses of the current transformer according cardell cabinets to the transformer losses is more efficient it replaced, the cost-benefit analysis can be considered done. The factory, taking cardell cabinets into account cardell cabinets the need for cooling depends on the season, could be considered a trigeneration project. Thus, during the production of electricity will be produced ejected recovered energy can be utilized in cold water machine and mold cooling of the engine. Factory in injection efficiency of existing chillers to cool the mold and engines cardell cabinets machines (COP), outside air temperature, humidity, cooling-degree-day values and refrigerant temperature and so on. as measured parameters, constantly kept under control, provided the determination of cooling costs and hence the budget. The screws on the injector machine works with a hydraulic system. Instead, these systems more efficient, motor + inverter systems can be used. France has made in this way are said to provide savings in the conversion rate of 30-31%. First, for large capacity syringe is transformed into the system to start the machine more efficient projects, TTGV 6% interest rate, grace period of 2 years, 4 years exploited support payments. One inverter on each machine in the factory. Is known to increase the harmonics of the inverter. Each year, harmonic measurements should be made and, where necessary, according to the results of active filter should be used. Pressure testing of the products produced in the factory, the pressure of 1.5 times the operating pressure (24 bar) is performed cardell cabinets by using presses. The test water used in the cleaning of accumulating plants in test carboy end, if there is any leakage during the test is spreading to the test environment. With the aid of a water tank used in the pressure test may be circulated in a closed environment, thus allowing water conservation. BOILER / FURNACE / WASHING cardell cabinets UNITS absence of external insulation and roof of the building was found to be in very poor condition. The plant is on the agenda of moving to another place is specified. Insulation of the roof and the building will be wrapped by providing savings in heating and cooling cardell cabinets costs. It was stated that retention of data related to energy consumption. Keeping a record of the data related to the types of energy consumed cardell cabinets in the factory, monitoring tables and graphics, to reduce the consumption cost improvements d

No comments:

Post a Comment